Demolition

Controlled demolition, with what stays protected and the waste taken away.

During — demolition and stripping out of finishes

Demolishing well is knowing what not to touch. Before we break anything we identify what is structural, where the risers run, and what is being kept. What stays is protected; what comes out is separated and sent to the proper facility.

What is included

  • A survey of what is structural before anything starts
  • Protection of floors, windows and common areas
  • Removal of walls, coverings and ceilings
  • Chasing walls for new services
  • Removal and disposal of waste
Room under construction, before the microcement goes onDuring — demolition and stripping out of finishesStripping ceramic tiling from a bathroomBefore — the flat before the works, with the finishes past savingBefore — stair stripped back to the masonryRoom under construction, before the finishesStructure exposed during demolitionBefore and after — walls hacked back, levelled and painted

Request a quote

We come to the site, take measurements and give you a detailed quote broken down by section. No cost, no obligation.

We reply within one working day. If it is urgent, call us.

WhatsApp