• Contractor certificate no. 143594-PUB
  • Written warranty: 3 years finishes · 5 years structural
  • Company no. (NIPC) 517 049 406

Work gallery

Work gallery

Loose photographs of our own jobs, with no location attached: demolition, pipework, consumer units, plaster, cladding and finishes. If you are looking for complete projects, with the before and the after, they are in Projects.

243 photographs

microcement floor by the staircase — general finishes in Alcabideche, CascaisDuring
During — microcement floor by the staircase
green striped tile detail — general finishes in Alcabideche, CascaisDuring
During — green striped tile detail
front door protected before finishing — general finishes in Alcabideche, CascaisDuring
During — front door protected before finishing
front door installed, awaiting paint — general finishes in Alcabideche, CascaisDuring
During — front door installed, awaiting paint
front door with glass and handle — general finishes in Alcabideche, CascaisDuring
During — front door with glass and handle
levelling the interior floor — general finishes in Alcabideche, CascaisDuring
During — levelling the interior floor
levelled interior floor — general finishes in Alcabideche, CascaisDuring
During — levelled interior floor
levelled floor in the bedroom — general finishes in Alcabideche, CascaisDuring
During — levelled floor in the bedroom
bedroom with levelled floor and skylight — general finishes in Alcabideche, CascaisDuring
During — bedroom with levelled floor and skylight
open-plan living room painted with protected floor — general finishes in Alcabideche, CascaisDuring
During — open-plan living room painted with protected floor
painted room with opening to the floor below — general finishes in Alcabideche, CascaisDuring
During — painted room with opening to the floor below
painted bedroom with light points — general finishes in Alcabideche, CascaisDuring
During — painted bedroom with light points
open-plan space painted, in the finishing stage — general finishes in Alcabideche, CascaisDuring
During — open-plan space painted, in the finishing stage
painted room by the hallway — general finishes in Alcabideche, CascaisDuring
During — painted room by the hallway
painted garage with high windows — general finishes in Alcabideche, CascaisDuring
During — painted garage with high windows
garage with sectional door — general finishes in Alcabideche, CascaisDuring
During — garage with sectional door
painted room with pipes to be connected — general finishes in Alcabideche, CascaisDuring
During — painted room with pipes to be connected
skylight and sloped ceiling above the stairs — general finishes in Alcabideche, CascaisDuring
During — skylight and sloped ceiling above the stairs
painted hallway with stairs at the end — general finishes in Alcabideche, CascaisDuring
During — painted hallway with stairs at the end
painted living room with opening to the stairs — general finishes in Alcabideche, CascaisDuring
During — painted living room with opening to the stairs
garage with window and painted walls — general finishes in Alcabideche, CascaisDuring
During — garage with window and painted walls
floor with stair opening and painted walls — general finishes in Alcabideche, CascaisDuring
During — floor with stair opening and painted walls
skim coating the hallway walls — general finishes in Alcabideche, CascaisDuring
During — skim coating the hallway walls
skim coating and painting in the living room — general finishes in Alcabideche, CascaisDuring
During — skim coating and painting in the living room
painting a high wall with a stepladder — general finishes in Alcabideche, CascaisDuring
During — painting a high wall with a stepladder
painting the wall by the window — general finishes in Alcabideche, CascaisDuring
During — painting the wall by the window
painter working on the wall — general finishes in Alcabideche, CascaisDuring
During — painter working on the wall
double-height living room during painting — general finishes in Alcabideche, CascaisDuring
During — double-height living room during painting
painting the living room with high windows — general finishes in Alcabideche, CascaisDuring
During — painting the living room with high windows
painted walls and ceilings in the open-plan space — general finishes in Alcabideche, CascaisDuring
During — painted walls and ceilings in the open-plan space
painted double-height living room — general finishes in Alcabideche, CascaisDuring
During — painted double-height living room
painted living room with scaffolding — general finishes in Alcabideche, CascaisDuring
During — painted living room with scaffolding
clad column by the balcony with scaffolding — damp repairs and façade in Areeiro, LisboaDuring
During — clad column by the balcony with scaffolding
door opening and walls awaiting render — skim coating, painting and microcement floor in Azóia, SintraDuring
During — door opening and walls awaiting render
room with exposed services — skim coating, painting and microcement floor in Azóia, SintraDuring
During — room with exposed services
hallway during preparation — skim coating, painting and microcement floor in Azóia, SintraDuring
During — hallway during preparation
bedroom with ceiling to be repaired — skim coating, painting and microcement floor in Azóia, SintraDuring
During — bedroom with ceiling to be repaired
living room with skim-coated walls and unfinished floor — skim coating, painting and microcement floor in Azóia, SintraDuring
During — living room with skim-coated walls and unfinished floor
hallway with painted walls — skim coating, painting and microcement floor in Azóia, SintraDuring
During — hallway with painted walls
bedroom painted before the floor — skim coating, painting and microcement floor in Azóia, SintraDuring
During — bedroom painted before the floor
living room with fireplace and painted walls — skim coating, painting and microcement floor in Azóia, SintraDuring
During — living room with fireplace and painted walls
painted living room with fireplace — skim coating, painting and microcement floor in Azóia, SintraDuring
During — painted living room with fireplace
painted room with window — skim coating, painting and microcement floor in Azóia, SintraDuring
During — painted room with window
hallway with glass door — skim coating, painting and microcement floor in Azóia, SintraDuring
During — hallway with glass door
painted hallway — skim coating, painting and microcement floor in Azóia, SintraDuring
During — painted hallway
painted bedroom with garden door — skim coating, painting and microcement floor in Azóia, SintraDuring
During — painted bedroom with garden door
cleaning the microcement floor — skim coating, painting and microcement floor in Azóia, SintraDuring
During — cleaning the microcement floor
applying microcement to the floor — skim coating, painting and microcement floor in Azóia, SintraDuring
During — applying microcement to the floor

These are all our own projects

None of these photographs was bought or taken from the internet. Where a photograph shows a private client’s home, we do not give the address or the name.

Shall we talk about your project?

Tell us what you need e marcamos uma visita, sem custo e sem compromisso.

243 photographs

microcement floor by the staircase — general finishes in Alcabideche, CascaisDuring
During — microcement floor by the staircase
green striped tile detail — general finishes in Alcabideche, CascaisDuring
During — green striped tile detail
front door protected before finishing — general finishes in Alcabideche, CascaisDuring
During — front door protected before finishing
front door installed, awaiting paint — general finishes in Alcabideche, CascaisDuring
During — front door installed, awaiting paint
front door with glass and handle — general finishes in Alcabideche, CascaisDuring
During — front door with glass and handle
levelling the interior floor — general finishes in Alcabideche, CascaisDuring
During — levelling the interior floor
levelled interior floor — general finishes in Alcabideche, CascaisDuring
During — levelled interior floor
levelled floor in the bedroom — general finishes in Alcabideche, CascaisDuring
During — levelled floor in the bedroom
bedroom with levelled floor and skylight — general finishes in Alcabideche, CascaisDuring
During — bedroom with levelled floor and skylight
open-plan living room painted with protected floor — general finishes in Alcabideche, CascaisDuring
During — open-plan living room painted with protected floor
painted room with opening to the floor below — general finishes in Alcabideche, CascaisDuring
During — painted room with opening to the floor below
painted bedroom with light points — general finishes in Alcabideche, CascaisDuring
During — painted bedroom with light points
open-plan space painted, in the finishing stage — general finishes in Alcabideche, CascaisDuring
During — open-plan space painted, in the finishing stage
painted room by the hallway — general finishes in Alcabideche, CascaisDuring
During — painted room by the hallway
painted garage with high windows — general finishes in Alcabideche, CascaisDuring
During — painted garage with high windows
garage with sectional door — general finishes in Alcabideche, CascaisDuring
During — garage with sectional door
painted room with pipes to be connected — general finishes in Alcabideche, CascaisDuring
During — painted room with pipes to be connected
skylight and sloped ceiling above the stairs — general finishes in Alcabideche, CascaisDuring
During — skylight and sloped ceiling above the stairs
painted hallway with stairs at the end — general finishes in Alcabideche, CascaisDuring
During — painted hallway with stairs at the end
painted living room with opening to the stairs — general finishes in Alcabideche, CascaisDuring
During — painted living room with opening to the stairs
garage with window and painted walls — general finishes in Alcabideche, CascaisDuring
During — garage with window and painted walls
floor with stair opening and painted walls — general finishes in Alcabideche, CascaisDuring
During — floor with stair opening and painted walls
skim coating the hallway walls — general finishes in Alcabideche, CascaisDuring
During — skim coating the hallway walls
skim coating and painting in the living room — general finishes in Alcabideche, CascaisDuring
During — skim coating and painting in the living room
painting a high wall with a stepladder — general finishes in Alcabideche, CascaisDuring
During — painting a high wall with a stepladder
painting the wall by the window — general finishes in Alcabideche, CascaisDuring
During — painting the wall by the window
painter working on the wall — general finishes in Alcabideche, CascaisDuring
During — painter working on the wall
double-height living room during painting — general finishes in Alcabideche, CascaisDuring
During — double-height living room during painting
painting the living room with high windows — general finishes in Alcabideche, CascaisDuring
During — painting the living room with high windows
painted walls and ceilings in the open-plan space — general finishes in Alcabideche, CascaisDuring
During — painted walls and ceilings in the open-plan space
painted double-height living room — general finishes in Alcabideche, CascaisDuring
During — painted double-height living room
painted living room with scaffolding — general finishes in Alcabideche, CascaisDuring
During — painted living room with scaffolding
clad column by the balcony with scaffolding — damp repairs and façade in Areeiro, LisboaDuring
During — clad column by the balcony with scaffolding
door opening and walls awaiting render — skim coating, painting and microcement floor in Azóia, SintraDuring
During — door opening and walls awaiting render
room with exposed services — skim coating, painting and microcement floor in Azóia, SintraDuring
During — room with exposed services
hallway during preparation — skim coating, painting and microcement floor in Azóia, SintraDuring
During — hallway during preparation
bedroom with ceiling to be repaired — skim coating, painting and microcement floor in Azóia, SintraDuring
During — bedroom with ceiling to be repaired
living room with skim-coated walls and unfinished floor — skim coating, painting and microcement floor in Azóia, SintraDuring
During — living room with skim-coated walls and unfinished floor
hallway with painted walls — skim coating, painting and microcement floor in Azóia, SintraDuring
During — hallway with painted walls
bedroom painted before the floor — skim coating, painting and microcement floor in Azóia, SintraDuring
During — bedroom painted before the floor
living room with fireplace and painted walls — skim coating, painting and microcement floor in Azóia, SintraDuring
During — living room with fireplace and painted walls
painted living room with fireplace — skim coating, painting and microcement floor in Azóia, SintraDuring
During — painted living room with fireplace
painted room with window — skim coating, painting and microcement floor in Azóia, SintraDuring
During — painted room with window
hallway with glass door — skim coating, painting and microcement floor in Azóia, SintraDuring
During — hallway with glass door
painted hallway — skim coating, painting and microcement floor in Azóia, SintraDuring
During — painted hallway
painted bedroom with garden door — skim coating, painting and microcement floor in Azóia, SintraDuring
During — painted bedroom with garden door
cleaning the microcement floor — skim coating, painting and microcement floor in Azóia, SintraDuring
During — cleaning the microcement floor
applying microcement to the floor — skim coating, painting and microcement floor in Azóia, SintraDuring
During — applying microcement to the floor

Would you like work like this in your home?

Tell us what you need. We come to the site, take measurements and give you a detailed quote broken down by section.

WhatsApp