Stripped back to the blockwork, new water and waste pipework, and the whole wet area waterproofed before anything was laid.
The marble was chosen from the slab and cut with the vein in mind, so that the worktop and the cladding carry the same pattern. The wall-hung unit and the backlit mirror were made to measure.









