• Contractor certificate no. 143594-PUB
  • Written warranty: 3 years finishes · 5 years structural
  • Company no. (NIPC) 517 049 406

Demolition and infrastructure

Ajuda, Lisboa Flat parte-da-obra Plumbing, demolition, electrical work and structure and concrete

  • 15 photographs
  • 3 work sections
  • 2026 completed
  • 2 weeks on site

The job, stage by stage

15 photographs and 3 stages, in the order the work was done.

Share
Chases in the walls and earth floor 9 / 15

Stage 02 of 03

Demolition and chases for services

Chases in the walls and earth floor

All the photographs

All 15 photographs, sorted by stage

Pick a stage, or see everything. Tap a photo to see it full size.

1 Sewer network 7 photographs

digging a trench for the sewer pipe — demolition and infrastructure in Ajuda, Lisboa
During — digging a trench for the sewer pipe
opening the wall for pipework — demolition and infrastructure in Ajuda, Lisboa
During — opening the wall for pipework
trench for the drain pipe — demolition and infrastructure in Ajuda, Lisboa
During — trench for the drain pipe
floor lifted in the bathroom — demolition and infrastructure in Ajuda, Lisboa
During — floor lifted in the bathroom
drain pipe in the trench — demolition and infrastructure in Ajuda, Lisboa
During — drain pipe in the trench
floor lifted by the toilet — demolition and infrastructure in Ajuda, Lisboa
During — floor lifted by the toilet
new drain pipe in the floor — demolition and infrastructure in Ajuda, Lisboa
During — new drain pipe in the floor

2 Demolition and chases for services 6 photographs

living room with chases and demolished floor — demolition and infrastructure in Ajuda, Lisboa
During — living room with chases and demolished floor
chases in the walls and earth floor — demolition and infrastructure in Ajuda, Lisboa
During — chases in the walls and earth floor
chases in the walls for services — demolition and infrastructure in Ajuda, Lisboa
During — chases in the walls for services
electrical chases and demolished floor — demolition and infrastructure in Ajuda, Lisboa
During — electrical chases and demolished floor
demolition debris in the van — demolition and infrastructure in Ajuda, Lisboa
During — demolition debris in the van
electrical chases filled with mortar — demolition and infrastructure in Ajuda, Lisboa
During — electrical chases filled with mortar

3 Shoring and new openings 2 photographs

temporary shoring on site — demolition and infrastructure in Ajuda, Lisboa
During — temporary shoring on site
shoring the opening while opening the wall — demolition and infrastructure in Ajuda, Lisboa
During — shoring the opening while opening the wall

Want a job like this one? We visit the site, take the measurements and give you a detailed quote.

Request a quote

What we were asked to do

Demolition of floors and chases in the walls, trench digging, a new sewer network and services.

Year
2026
Type
Flat
Scope
parte-da-obra
Photographs
15
Work sections
3
Work types
4
Work carried out
  • Plumbing
  • Demolition
  • Electrical work
  • Structure and concrete

The job, told

Materials

  • Waste pipework
  • Mortar
  • Temporary propping

Duration

2 weeks

Would you like work like this in your home?