Skim coating, painting and microcement floor
- 32 photographs
- 5 work sections
- 2023 completed
- 5 weeks on site
The job, stage by stage
32 photographs and 5 stages, in the order the work was done.
32 / 32
Stage 05 of 05
Final result
Finished microcement floor
The challenge
A house run down inside, with hacked walls and graffiti.
The solution
Walls rendered, skimmed and painted, and a seamless microcement floor throughout the house.
Duration 5 weeks
I want a job like thisAll 32 photographs, sorted by stage
Pick a stage, or see everything. Tap a photo to see it full size.
1 Before the works 6 photographs
2 Wall preparation and render 5 photographs
3 Skim coating and painting 9 photographs









4 Microcement floor 9 photographs









5 Final result 3 photographs
Want a job like this one? We visit the site, take the measurements and give you a detailed quote.
Request a quoteWhat we were asked to do
Interior refurbishment of a house: skim-coated and painted walls and a seamless microcement floor throughout.
- Year
- 2023
- Type
- House
- Scope
- um-trabalho-so
- Photographs
- 32
- Work sections
- 5
- Work types
- 4
- Plaster and render
- Microcement
- Flooring
- Painting
The job, told
How we did it
Materials
- Render
- Skim coat and paint
- Microcement
Duration
5 weeks