General finishes

Interior finishes in a house: a microcement staircase with cantilevered steps, a bathroom with a microcement floor and curved wall, floor levelling, skim coating and painting of the double-height living room, kitchen fitting and front door. Includes the bathroom with green and white striped tiles. Outside: excavation, a pool in concrete blocks and reinforced concrete, and artificial grass.

Alcabideche, Cascais House Turnkey Masonry, Bespoke joinery, Bathrooms, Ceramic and tile

finished microcement staircase — general finishes in Alcabideche, Cascais
Year
2026
Type
House
Scope
Turnkey
Photographs
106
Work sections
9
Work types
17

Work carried out
Masonry · Bespoke joinery · Bathrooms · Ceramic and tile · Kitchens · Electrical work · Stairs · Structure and concrete · Plaster and render · Exteriors · Microcement · Flooring · Painting · Ceilings and plasterboard

After

11 photographs of the result

finished staircase seen from above — general finishes in Alcabideche, Cascais
After — finished staircase seen from above
finished microcement floor — general finishes in Alcabideche, Cascais
After — finished microcement floor
finished curved microcement wall — general finishes in Alcabideche, Cascais
After — finished curved microcement wall
finished floor by the striped tiles — general finishes in Alcabideche, Cascais
After — finished floor by the striped tiles
finished floor and countertop — general finishes in Alcabideche, Cascais
After — finished floor and countertop
finished floor seen from the door — general finishes in Alcabideche, Cascais
After — finished floor seen from the door
finished bathroom floor — general finishes in Alcabideche, Cascais
After — finished bathroom floor
finished green and white tiled niche — general finishes in Alcabideche, Cascais
After — finished green and white tiled niche
finished bathroom with wall-hung toilet — general finishes in Alcabideche, Cascais
After — finished bathroom with wall-hung toilet
finished front door — general finishes in Alcabideche, Cascais
After — finished front door
finished pool with artificial grass — general finishes in Alcabideche, Cascais
After — finished pool with artificial grass

Want a job like this one? We visit the site, take the measurements and give you a detailed quote.

Request a quote
Record of works

How we got there, in 9 work sections

The job was worked in sections. Open whichever one interests you; the captions say what you are looking at.

1 Microcement staircase 19 photographs

scaffolding in the staircase area — general finishes in Alcabideche, CascaisDuring
During — scaffolding in the staircase area
levelled concrete staircase — general finishes in Alcabideche, CascaisDuring
During — levelled concrete staircase
staircase base before microcement — general finishes in Alcabideche, CascaisDuring
During — staircase base before microcement
preparing the staircase under the cantilevered steps — general finishes in Alcabideche, CascaisDuring
During — preparing the staircase under the cantilevered steps
metal frames for the cantilevered steps — general finishes in Alcabideche, CascaisDuring
During — metal frames for the cantilevered steps
metal step frames on the staircase — general finishes in Alcabideche, CascaisDuring
During — metal step frames on the staircase
first coat of microcement on the staircase — general finishes in Alcabideche, CascaisDuring
During — first coat of microcement on the staircase
microcement staircase, side view — general finishes in Alcabideche, CascaisDuring
During — microcement staircase, side view
microcement on the treads and risers — general finishes in Alcabideche, CascaisDuring
During — microcement on the treads and risers
cantilevered step frames and microcement staircase — general finishes in Alcabideche, CascaisDuring
During — cantilevered step frames and microcement staircase
finished microcement staircase — general finishes in Alcabideche, CascaisAfter
After — finished microcement staircase
microcement staircase with cantilevered steps — general finishes in Alcabideche, CascaisDuring
During — microcement staircase with cantilevered steps
microcement steps, front view — general finishes in Alcabideche, CascaisDuring
During — microcement steps, front view
microcement staircase with satin finish — general finishes in Alcabideche, CascaisDuring
During — microcement staircase with satin finish
finished staircase seen from above — general finishes in Alcabideche, CascaisAfter
After — finished staircase seen from above
microcement staircase, step detail — general finishes in Alcabideche, CascaisDuring
During — microcement staircase, step detail
microcement floor by the staircase — general finishes in Alcabideche, CascaisDuring
During — microcement floor by the staircase
concrete staircase before microcement — general finishes in Alcabideche, CascaisDuring
During — concrete staircase before microcement
staircase clad in microcement — general finishes in Alcabideche, CascaisDuring
During — staircase clad in microcement

2 Microcement bathroom 14 photographs

microcement bathroom floor — general finishes in Alcabideche, CascaisDuring
During — microcement bathroom floor
microcement floor by the shower tray — general finishes in Alcabideche, CascaisDuring
During — microcement floor by the shower tray
microcement floor by the toilet — general finishes in Alcabideche, CascaisDuring
During — microcement floor by the toilet
microcement under the vanity — general finishes in Alcabideche, CascaisDuring
During — microcement under the vanity
microcement wall by the mosaic — general finishes in Alcabideche, CascaisDuring
During — microcement wall by the mosaic
microcement floor with marble effect — general finishes in Alcabideche, CascaisDuring
During — microcement floor with marble effect
microcement floor, overall view — general finishes in Alcabideche, CascaisDuring
During — microcement floor, overall view
curved microcement wall and blue mosaic — general finishes in Alcabideche, CascaisDuring
During — curved microcement wall and blue mosaic
microcement on the floor and shower base — general finishes in Alcabideche, CascaisDuring
During — microcement on the floor and shower base
varnished microcement floor — general finishes in Alcabideche, CascaisDuring
During — varnished microcement floor
glossy finish on the microcement floor — general finishes in Alcabideche, CascaisDuring
During — glossy finish on the microcement floor
varnished microcement, detail — general finishes in Alcabideche, CascaisDuring
During — varnished microcement, detail
finished microcement floor — general finishes in Alcabideche, CascaisAfter
After — finished microcement floor
finished curved microcement wall — general finishes in Alcabideche, CascaisAfter
After — finished curved microcement wall

3 Bathroom with striped tiles 19 photographs

levelling the bathroom floor — general finishes in Alcabideche, CascaisDuring
During — levelling the bathroom floor
masonry vanity and levelled floor — general finishes in Alcabideche, CascaisDuring
During — masonry vanity and levelled floor
levelled floor by the tiles — general finishes in Alcabideche, CascaisDuring
During — levelled floor by the tiles
levelled floor by the door — general finishes in Alcabideche, CascaisDuring
During — levelled floor by the door
levelled countertop and floor — general finishes in Alcabideche, CascaisDuring
During — levelled countertop and floor
finished floor by the striped tiles — general finishes in Alcabideche, CascaisAfter
After — finished floor by the striped tiles
floor and countertop by the tiles — general finishes in Alcabideche, CascaisDuring
During — floor and countertop by the tiles
finished floor and countertop — general finishes in Alcabideche, CascaisAfter
After — finished floor and countertop
floor by the countertop — general finishes in Alcabideche, CascaisDuring
During — floor by the countertop
finished floor seen from the door — general finishes in Alcabideche, CascaisAfter
After — finished floor seen from the door
finished bathroom floor — general finishes in Alcabideche, CascaisAfter
After — finished bathroom floor
shower tray and green striped tiles — general finishes in Alcabideche, CascaisDuring
During — shower tray and green striped tiles
niche clad in green and white tiles — general finishes in Alcabideche, CascaisDuring
During — niche clad in green and white tiles
bathroom with striped tiles and toilet — general finishes in Alcabideche, CascaisDuring
During — bathroom with striped tiles and toilet
finished green and white tiled niche — general finishes in Alcabideche, CascaisAfter
After — finished green and white tiled niche
bathroom with striped tiles and niche — general finishes in Alcabideche, CascaisDuring
During — bathroom with striped tiles and niche
finished bathroom with wall-hung toilet — general finishes in Alcabideche, CascaisAfter
After — finished bathroom with wall-hung toilet
green striped tile detail — general finishes in Alcabideche, CascaisDuring
During — green striped tile detail
shower niche in striped tiles — general finishes in Alcabideche, CascaisDuring
During — shower niche in striped tiles

4 Bathroom with LED cove 4 photographs

false ceiling with LED cove in a bathroom on site — general finishes in Alcabideche, Cascais
During — false ceiling with LED cove in a bathroom on site
light stone bathroom with LED cove — general finishes in Alcabideche, Cascais
During — light stone bathroom with LED cove
wall-hung toilets and lit cove — general finishes in Alcabideche, Cascais
During — wall-hung toilets and lit cove
pedestal washbasin and LED skirting — general finishes in Alcabideche, Cascais
During — pedestal washbasin and LED skirting

5 Kitchen and front door 6 photographs

fitting the kitchen units — general finishes in Alcabideche, CascaisDuring
During — fitting the kitchen units
kitchen being installed, seen from the living room — general finishes in Alcabideche, CascaisDuring
During — kitchen being installed, seen from the living room
front door protected before finishing — general finishes in Alcabideche, CascaisDuring
During — front door protected before finishing
front door installed, awaiting paint — general finishes in Alcabideche, CascaisDuring
During — front door installed, awaiting paint
front door with glass and handle — general finishes in Alcabideche, CascaisDuring
During — front door with glass and handle
finished front door — general finishes in Alcabideche, CascaisAfter
After — finished front door

6 Floor levelling 6 photographs

levelling the exterior floor by the windows — general finishes in Alcabideche, Cascais
During — levelling the exterior floor by the windows
levelled exterior floor on the balcony — general finishes in Alcabideche, Cascais
During — levelled exterior floor on the balcony
levelling the interior floor — general finishes in Alcabideche, Cascais
During — levelling the interior floor
levelled interior floor — general finishes in Alcabideche, Cascais
During — levelled interior floor
levelled floor in the bedroom — general finishes in Alcabideche, Cascais
During — levelled floor in the bedroom
bedroom with levelled floor and skylight — general finishes in Alcabideche, Cascais
During — bedroom with levelled floor and skylight

7 Interior skim coating and painting 24 photographs

open-plan living room painted with protected floor — general finishes in Alcabideche, Cascais
During — open-plan living room painted with protected floor
painted room with opening to the floor below — general finishes in Alcabideche, Cascais
During — painted room with opening to the floor below
painted bedroom with light points — general finishes in Alcabideche, Cascais
During — painted bedroom with light points
open-plan space painted, in the finishing stage — general finishes in Alcabideche, Cascais
During — open-plan space painted, in the finishing stage
painted room by the hallway — general finishes in Alcabideche, Cascais
During — painted room by the hallway
painted garage with high windows — general finishes in Alcabideche, Cascais
During — painted garage with high windows
garage with sectional door — general finishes in Alcabideche, Cascais
During — garage with sectional door
painted room with pipes to be connected — general finishes in Alcabideche, Cascais
During — painted room with pipes to be connected
skylight and sloped ceiling above the stairs — general finishes in Alcabideche, Cascais
During — skylight and sloped ceiling above the stairs
painted hallway with stairs at the end — general finishes in Alcabideche, Cascais
During — painted hallway with stairs at the end
painted living room with opening to the stairs — general finishes in Alcabideche, Cascais
During — painted living room with opening to the stairs
garage with window and painted walls — general finishes in Alcabideche, Cascais
During — garage with window and painted walls
floor with stair opening and painted walls — general finishes in Alcabideche, Cascais
During — floor with stair opening and painted walls
skim coating the hallway walls — general finishes in Alcabideche, Cascais
During — skim coating the hallway walls
skim coating and painting in the living room — general finishes in Alcabideche, Cascais
During — skim coating and painting in the living room
painting by the staircase with cantilevered steps — general finishes in Alcabideche, Cascais
During — painting by the staircase with cantilevered steps
painting a high wall with a stepladder — general finishes in Alcabideche, Cascais
During — painting a high wall with a stepladder
painting the wall by the window — general finishes in Alcabideche, Cascais
During — painting the wall by the window
painter working on the wall — general finishes in Alcabideche, Cascais
During — painter working on the wall
double-height living room during painting — general finishes in Alcabideche, Cascais
During — double-height living room during painting
painting the living room with high windows — general finishes in Alcabideche, Cascais
During — painting the living room with high windows
painted walls and ceilings in the open-plan space — general finishes in Alcabideche, Cascais
During — painted walls and ceilings in the open-plan space
painted double-height living room — general finishes in Alcabideche, Cascais
During — painted double-height living room
painted living room with scaffolding — general finishes in Alcabideche, Cascais
During — painted living room with scaffolding

8 Electrical, panels and car charger 8 photographs

painted bedroom with ceiling fan — general finishes in Alcabideche, Cascais
During — painted bedroom with ceiling fan
ceiling fan installed — general finishes in Alcabideche, Cascais
During — ceiling fan installed
ceiling fan with light — general finishes in Alcabideche, Cascais
During — ceiling fan with light
main electrical panel with new wiring — general finishes in Alcabideche, Cascais
During — main electrical panel with new wiring
cables arriving at the electrical panel — general finishes in Alcabideche, Cascais
During — cables arriving at the electrical panel
electrical panel with circuits installed — general finishes in Alcabideche, Cascais
During — electrical panel with circuits installed
electric car charger in the garage — general finishes in Alcabideche, Cascais
During — electric car charger in the garage
distribution panel with new conduits — general finishes in Alcabideche, Cascais
During — distribution panel with new conduits

9 Pool and landscaping 6 photographs

excavation along the garden — general finishes in Alcabideche, CascaisDuring
During — excavation along the garden
excavation for the pool with an excavator — general finishes in Alcabideche, CascaisDuring
During — excavation for the pool with an excavator
pool shell built in concrete blocks — general finishes in Alcabideche, CascaisDuring
During — pool shell built in concrete blocks
steel reinforcement before concreting — general finishes in Alcabideche, CascaisDuring
During — steel reinforcement before concreting
finished pool with artificial grass — general finishes in Alcabideche, CascaisAfter
After — finished pool with artificial grass
excavation and formwork in the backyard — general finishes in Alcabideche, CascaisDuring
During — excavation and formwork in the backyard