Plasterboard ceilings, skim coating and wooden floor
- 58 photographs
- 5 work sections
- 2025 completed
- 4 weeks on site
The job, stage by stage
58 photographs and 5 stages, in the order the work was done.
58 / 58
Stage 05 of 05
Final result
Living room with finished pine floor
The challenge
New ceilings in a house — bathrooms included, where moisture calls for a different board — and an even finish on walls and ceilings.
The solution
Plasterboard ceilings, moisture-resistant in the bathrooms; walls and ceilings skimmed using levelling rules; tiles and a pine floor laid.
Duration 4 weeks
I want a job like thisAll 58 photographs, sorted by stage
Pick a stage, or see everything. Tap a photo to see it full size.
1 Plasterboard ceilings and walls 12 photographs












2 Skim coating walls and ceilings 38 photographs






































3 Tiling 4 photographs
4 Pine floor 3 photographs
5 Final result 1 photograph
Want a job like this one? We visit the site, take the measurements and give you a detailed quote.
Request a quoteWhat we were asked to do
Plasterboard suspended ceilings (moisture-resistant in the bathrooms), skim coating of walls and ceilings and laying a pine wooden floor in a house.
- Year
- 2025
- Type
- House
- Scope
- parte-da-obra
- Photographs
- 58
- Work sections
- 5
- Work types
- 5
- Bathrooms
- Ceramic and tile
- Plaster and render
- Flooring
- Ceilings and plasterboard
The job, told
How we did it
Materials
- Plasterboard and moisture-resistant board
- Skim coat
- Tiles
- Pine floor
Duration
4 weeks
Other projects



No projects match these filters. Try removing one.
Would you like work like this in your home?
Tell us what you need. We come to the site, take measurements and give you a detailed quote broken down by section.