• Contractor certificate no. 143594-PUB
  • Written warranty: 3 years finishes · 5 years structural
  • Company no. (NIPC) 517 049 406

Bathroom renovation

Rio de Mouro, Sintra Flat parte-da-obra Bathrooms, ceramic and tile, demolition and plaster and render

  • 14 photographs
  • 3 work sections
  • 2025 completed
  • 2 weeks on site

The job, stage by stage

14 photographs and 3 stages, in the order the work was done.

Share
Cutting tiles for the bathroom 5 / 14

Stage 02 of 03

Tiling

Cutting tiles for the bathroom

All the photographs

All 14 photographs, sorted by stage

Pick a stage, or see everything. Tap a photo to see it full size.

1 Bathroom preparation 4 photographs

shower area before cladding — bathroom renovation in Rio de Mouro, Sintra
During — shower area before cladding
shower base with levelled walls — bathroom renovation in Rio de Mouro, Sintra
During — shower base with levelled walls
stripped walls and shower tap — bathroom renovation in Rio de Mouro, Sintra
During — stripped walls and shower tap
delivering the tiles to site — bathroom renovation in Rio de Mouro, Sintra
During — delivering the tiles to site

2 Tiling 9 photographs

cutting tiles for the bathroom — bathroom renovation in Rio de Mouro, Sintra
During — cutting tiles for the bathroom
preparing the tiles on site — bathroom renovation in Rio de Mouro, Sintra
During — preparing the tiles on site
laying tiles on the wall — bathroom renovation in Rio de Mouro, Sintra
During — laying tiles on the wall
tiled floor with levelling system — bathroom renovation in Rio de Mouro, Sintra
During — tiled floor with levelling system
laying floor tiles with levelling system — bathroom renovation in Rio de Mouro, Sintra
During — laying floor tiles with levelling system
bathroom floor being tiled — bathroom renovation in Rio de Mouro, Sintra
During — bathroom floor being tiled
tile trim by the opening — bathroom renovation in Rio de Mouro, Sintra
During — tile trim by the opening
laying tiles in the shower area — bathroom renovation in Rio de Mouro, Sintra
During — laying tiles in the shower area
wall prepared for tiling with levelling system — bathroom renovation in Rio de Mouro, Sintra
During — wall prepared for tiling with levelling system

3 Final result 1 photograph

wall clad in large-format tiles — bathroom renovation in Rio de Mouro, Sintra
After — wall clad in large-format tiles

Want a job like this one? We visit the site, take the measurements and give you a detailed quote.

Request a quote

What we were asked to do

Renovation of a bathroom: wall preparation, shower base, tiling and sanitaryware.

Year
2025
Type
Flat
Scope
parte-da-obra
Photographs
14
Work sections
3
Work types
4
Work carried out
  • Bathrooms
  • Ceramic and tile
  • Demolition
  • Plaster and render

The job, told

Materials

  • Large-format tiles
  • Shower tray
  • Sanitaryware

Duration

2 weeks

Would you like work like this in your home?

Tell us what you need. We come to the site, take measurements and give you a detailed quote broken down by section.

WhatsApp