Demolition and infrastructure
- 15 photographs
- 3 work sections
- 2026 completed
- 2 weeks on site
The job, stage by stage
15 photographs and 3 stages, in the order the work was done.
9 / 15
Stage 02 of 03
Demolition and chases for services
Chases in the walls and earth floor
The challenge
Redo the drainage and prepare the services of a flat, with floors lifted and openings to cut in existing walls.
The solution
Trenches and new underfloor waste pipework, floors broken out and chases cut for the services, and temporary propping to open the walls safely.
Duration 2 weeks
I want a job like thisAll 15 photographs, sorted by stage
Pick a stage, or see everything. Tap a photo to see it full size.
1 Sewer network 7 photographs
2 Demolition and chases for services 6 photographs
3 Shoring and new openings 2 photographs
Want a job like this one? We visit the site, take the measurements and give you a detailed quote.
Request a quoteWhat we were asked to do
Demolition of floors and chases in the walls, trench digging, a new sewer network and services.
- Year
- 2026
- Type
- Flat
- Scope
- parte-da-obra
- Photographs
- 15
- Work sections
- 3
- Work types
- 4
- Plumbing
- Demolition
- Electrical work
- Structure and concrete
The job, told
How we did it
Materials
- Waste pipework
- Mortar
- Temporary propping
Duration
2 weeks